Grand Central Terminal
UBS designed, engineered and installed a 120'-long custom arched truss complete with work platforms that would span the main terminal floor over 100 feet below. Once installed, work could begin on the historic barrel vaulted ceiling without interruption to the 500,000 daily commuters below. UBS would relocate this custom platform as needed for the contractors using two custom built trolleys that would allow the rig to travel from one end of the terminal to the other. |
![]()
|